Search
 
 

Skip Navigation LinksHome > Projects > PennDOT

PennDOT

Storeroom, Offices and Training Room
Greensburg, Pennsylvania Facility
CV Engineering was the architect/engineer for this project that included improvements to the spare parts storage area, addition of a 2500 sq.ft. office building inside the repair bay, and complete renovation of a basement training room that included improvements for handicapped accessibility. The storeroom modifications required demolition of several existing walls, construction of new masonry walls, and modification of door openings. The new office building was designed using concrete masonry units with a steel supported concrete slab roof, and had to be designed to accommodate the interior furnishings. For the training room renovation, existing wood stud walls were removed and replaced with steel studs and gypsum board for compliance with fire code. Modification to the main entryway was done to accommodate wheelchair access, and a wheelchair lift was specified. Electrical design work included new zoned lighting fixtures, power outlets, and computer network connections.

Copyright © 2009 – 2011 CV Engineering

Home | About Us |  Services |  Projects | Awards |  Links |  Faqs | News | Testimonials | Quotes |  Employment